The installation of eight new utility services, each equipped with manual transfer switches and docking stations for mobile generators, ensured reliable backup power. Guarantee also managed the installation of 80 electrical panels, 70 transformers, and 2,000 wire terminations to optimize power distribution. Additionally, a new fire alarm system with zoned paging integration was installed, further improving safety and operational efficiency.
Project Highlights:
- Installed over 40,000 feet of feeder cable and 50,000 feet of conduit for electrical infrastructure upgrades.
- Eight new utility services with manual transfer switches and docking stations ensure reliable backup power.
- Over 2,000 power wire terminations and 80 new panels were installed to enhance power distribution.
- A new fire alarm system with zoned paging integration improves facility safety.
- Guarantee managed modifications to 223 dock doors, enhancing the facility’s operational capacity.