X

Industrial

Our experienced team creates a formidable partner for clients seeking a competitive edge with their capital investments – spanning more than 750 collaborating engineers, project managers, technical experts, office personnel, and IBEW superintendents, foremen, and electricians and automation specialists. The size and scope of our work generates value-added buying power when Guarantee selects and procures power, process and control system equipment and components.


Ameren Labadie and Rush Island Wastewater Treatment Plants
THE PROJECT Guarantee Electrical Company (Guarantee) provided electrical construction on a new, advanced water treatment plant at Ameren Missouri’s Labadie and Rush Island generation facilities.  Guarantee was tasked to install the full complement of electrical distribution equipment, wiring and control systems serving the wastewater treatment process.  The assignment encompa...

[View Full Project...]

Missouri Electrical Contractor
Actions: E-mail | Permalink |

Rocky Mountain Bottling
THE PROJECT Rocky Mountain Bottling produces and supplies glass bottles on behalf of Miller/Coors at its Owens-Brockway facility in Wheat Ridge, CO. As part of a renovation at the bottling plant, two smaller glass furnaces were replaced with one, unique, bottom-fed mega-furnace. The project represented a number of substantial innovations in glass ...

[View Full Project...]

Electrical construction company in Colorado
Posted in: Industrial
Actions: E-mail | Permalink |

Collinsville Water Treatment Plant
THE PROJECT Guarantee Electrical Company (Guarantee) was engaged by the City of Collinsville, Illinois to provide electrical and communications systems for a wholesale replacement of the City’s municipal water treatment facility.  Located across the street from the current facility constructed in 1958, the new plant expands the city’s capacity to over 5 million gallons of potab...

[View Full Project...]

Wastewater Electrical Contractor
Actions: E-mail | Permalink |

MO RIVER WASTEWATER TREATMENT PLANT
THE PROJECT Guarantee Electrical Company served as the prime contractor overseeing the mechanical additions to the Metropolitan Sewer District’s Missouri River Wastewater Treatment Facility.  These additions provided installation of a new gas detection system with relay and monitor panels at the facility.  Methane and CO2, as common by-products of wastewater processing are poten...

[View Full Project...]

Mechanical upgrade for wastewater treatment plant
Actions: E-mail | Permalink |

SIUe Electrical Infrastructure Expansion Phase II
Location: Edwardsville, IL Client: Southern Illinois University at Edwardsville Size: $3.6 Million THE PROJECT Phase II of the SIUE Electrical System upgrade brought control systems and diagnostics that brings intelligent electrical systems monitoring to all the main campus  buildings as well as the main HVAC plant serving the campus.  Phase II also completed the red...

[View Full Project...]

Posted in: Industrial
Actions: E-mail | Permalink |

Monsanto W-Building Lab HVAC Modernization
Location: Creve Coeur, Missouri Client: Monsanto Size: $1.7 Million THE PROJECT Exacting logistics decreed that performing a significant renovation in the midst of a busy, multi-mission laboratory, had to be superbly organized and managed between Corrigan’s mechanical technicians and GECO’s team of QR electricians.  The mission itself of increasing voltages to...

[View Full Project...]

Posted in: Industrial
Actions: E-mail | Permalink |

Heartland Biogas
Location: LaSalle, Colorado Client: Heartland Biogas Size: $5.6 Million THE PROJECT In many ways the Heartland Biogas production plant in La Salle Colorado represented a research and development project in the renewable energy sector. Designed to serve the area agriculture industry as an animal waste processing center, the plant represented a “new to the world” app...

[View Full Project...]

Posted in: Industrial
Actions: E-mail | Permalink |

America’s Central Port South Harbor
Location: Granite City, Illinois Client: Port Authority Size: $1.7 Million THE PROJECT Delivered electrical infrastructure and distribution supporting the South Harbor expansion of America’s Central Port created by the State of Illinois in the tri-cities  area (Madison, Venice and Granite City.)  The resulting expanded facility nearly doubles the capacity of th...

[View Full Project...]

Posted in: Industrial
Actions: E-mail | Permalink |

Town of Ault Wastewater Treatment Upgrade
Location: Ault, Colorado Client: Town of Ault Size: $700,000 THE PROJECT Guarantee Electrical Company (GECO) provided the electrical systems needed to upgrade the Town of Ault’s waste-water treatment plant (WWTP) from a holding pond lagoon system to a full scale headworks facility involving multi-process treatment as well as a two channel Ultra-Violet Disinfection proces...

[View Full Project...]

Posted in: Industrial
Actions: E-mail | Permalink |